Project-year of completion Name of investor Place Description of works

2005

ZETPEZET Piła

64-920 Piła
ul. Walki Młodych 30

Rehabilitation of process engineering system for potato processing

2005

STEICO S.A.

64-700 Czarnków
ul. Przemysłowa 2

Erection of MW 4 umbrellaroof for storage purposes with full infrastructure, including:

  • sanitary system
  • earth instalation and wiring system
  • road works

2005

PKS Sp. z o.o.

64-920 Piła
ul. Przemysłowa 23

Execution of constructional and assembly works related to re-construction of a workshop hall

2005

SAPA Aluminium Poland S.A.

64-980 Trzcianka
ul. Kopernika 18

Execution of service lines for sanitary sewage system and rain-water system and water-supply piping

2005

Ludwig Czekolada

78-640 Tuczno
ul. Kaszubska 2

Rehabilitation of installation:

  • team installation: performance of 3 distribution centres
  • ice water: prolongation of existing line
  • compressed air: prolongation of existing line

2005

Cukiernia Mistrza Jana

71-215 Szczecin
ul. Łukasińskiego 110

Performance of constructional work related to rehabilitation of Raw Materials Warehouse and Preparation Room

2005

Philips Lighting Poland S.A.

64-920 Piła
ul. Kossaka 150

Performance of constructional work - Hall 38

2005

NTA Sp. z o.o.

81-336 Gdynia
ul. Indyjska 13

Umbrella roof over a loading place of area 612 m2

2004

Philips Lighting Poland S.A.

64-920 Piła
ul. Kossaka 150

Performance of steel grate for technological floor at object 70 of area 8.000 m3

2004

Winkowski Sp. z o.o.

64-920 Piła
ul. Okrzei 8

Performance and assembly of steel structure for trims hall and trims store room

2004

Philips Lighting Poland S.A.

64-920 Piła
ul. Kossaka 150

Repair of social building at object 18

2004

Philips Lighting Poland S.A.

64-920 Piła
ul. Kossaka 150

Rehabilitation of ventilation system in building 70

2004

Philips Lighting Poland S.A.

64-920 Piła
ul. Kossaka 150

Performance and assembly of steel structures including lining:

  • Warehouse connector hall 18 c o of cubage 10 thousand m3
  • pre-warehouse of the object 44 of cubage 800 m3
  • pallet warehouse of cubage 8500 m3
  • loading banks object at building 47 of cubage 80 m3

2003/2004

Zakład Śnieżka S.A. w Brzeźnicy k/Dębicy

64-920 Piła
ul. Kossaka 92

Sanitary works comprising:

  • internal and external water and sewage service lines
  • gas terminals
  • gas and oil boiler house of capacity 900 kW
  • entral heating plant
  • gravity ventilation
  • fire-protection installation
  • detection system for explosive and toxic concentrations

2003

DEMOCO POLAND Sp. z o.o.

62-080 Tarnowo Podgórne
ul. Sowia 6/1

Performance of external systems:

  • rain-water drainage system
  • wastewater system

2003

ENERGOPROM S.A.

Warszawa
ul. Mokotowska 43

Performance of ventilation system at a building of Centrum Logistyczne ANECOOP POLSKA in Swarzędz - Jasin near/Poznań (watch-house, social and office part, warehouse, transformer station, technical room for distribution centres)

2003

ZARZĄD POWIATU w Pile

64-920 Piła
Al. Niepodległości

Rehabilitation of a coal boiler house into oil boiler house at Social Welfare House in Dębin.

2003

PARKSIDE FLEXIBLES S.A.

77-400 Złotów
ul. Za Dworcem 8

Main Subcontractor for performance of a high-storage warehouse along with a connecting building, rehabilitation of social rooms, ventilation system at production hall.

2003

Miejska Energetyka Cieplna Sp. z o.o. w Pile

64-920 Piła
ul. Kaczorska 20

Performance of a heat system under technology of pre-insulated pipes in the area of Grabowa-Bydgoska-Roosevelts Streets in Piła

2003

PKS Sp. z o.o.

64-920 Piła
ul. Przemysłowa 23

Complex rehabilitation of two storeys at a building + development

  • replacement of partition walls, window and door upholstery, inside lining
  • execution of gres and tarket floor
  • erection of suspended ceilings, elements of the building's facade, aluminium facade
  • execution of thermal protection system and change of the facade's colour
  • central heating-, water and sewage- and ventilation systems
  • road works

2003

VOLKSWAGEN

Swarzędz k/Poznania

  • assembly of services piping at the logistic hall

2003

PUDLISZKI S.A.

63-840 Krobia
ul. Fabryczna 7

  • installation of air conditioning, cooling and drying system ZACMI at the production hall

2002-2003

OKECHAMP S.A.

64-965 Okonek
Borucino

Main subcontractor for the Centre of Packaging, Sorting and Shipment of Champignons

  • steel hall of 1750 m2 including social and administration facilities 450 m2
  • ventilation system, water and sewage system, central heating, electrical wiring
  • road works

2002

HOCHLAND POLSKA

07-100 Węgrów
ul. Gdańska 83

  • Installation of air conditioning at cheese dairy, slicing section
  • assembly of ALKO THERM air conditioning control equipment
  • piping for ice water and heating system
  • heat distribution centre 900 kW

2002

TKT POLSKA S.A.

60-171 Poznań
ul. Żmigrodzka 41/49

PROLOGIS PARK in Piotrkowie Trybunalskim

  • execution of installation for roof drainage in Pluvia system of Geberit
  • performance of central heating system
  • installation works at boiler house
  • performance of gas installation

2002

TKT POLSKA S.A.

60-171 Poznań
ul. Żmigrodzka 41/49

Performance of heat distribution centres for Barracks Compound of Military Unit in Inowrocław

2001/2003

Państwowa Wyższa Szkoła Zawodowa w Pile

64-920 Piła
ul. Żeromskiego 14

  • Rehabilitation a boarding-school building to a hostel, Piła, Żeromskiego St.

2001/2002

Philips Enabling Technologies Group

64-920 Piła
Al. Powst. Wlkp

  • execution of water and sewage system, central heating and ventilation systems, air conditioning
  • execution of compressed air installation, ice water system
  • assembly of Heat distribution center 2 MW
  • execution of external central heating and water-sewage service lines

2001-2002

Hala Sportowa MOSIR

64-920 Piła
ul. Żeromskiego

  • internal water-sewage service lines
  • heating and ventilation installations
  • outer water-sewage piping
  • outer heating piping

2001-2002

SAF POLSKA

64-980 Trzcianka
ul. 22 Stycznia 42

  • Execution of a stell structure including lining for warehouses of area 800 m2 and 1200 m2

2001-2002

TAKATA PETRI

58-306 Wałbrzych
ul. Uczniowska 20

  • assembly of heating and ventilation system
  • execution of water and sewage system

2001-2002

Urząd Miasta w Pile

64-920 Piła
Plac Staszica

  • construction of a Gym Hall for Primary School No 1 in Piła

2001

Urząd Miasta w Pile

64-920 Piła
Plac Staszica

  • rehabilitation of a Gym Hall for Primary School No 4 in Piła

2001

BP Chemicals Olimp-Flex S.A.

77-400 Złotów
ul. Za Dworcem 8

  • rehabilitation of a warehouse and transport road

2001

Przedsiębiorstwo Komunikacji Samochodowej Sp. z o.o.

64-920 Piła
ul. Przemysłowa 23

  • assembly of gas boiler house of capacity 1.615 MW
  • rehabilitation of central heating system

2001

Szkoła Podstawowa nr 2 im. Wł. Broniewskiego

64-980 Trzcianka
ul. Chopina 36

  • assembly of gas boiler house of power 1.52 MW

2001

OKECHAMP S.A.

64-965 Okonek
Borucino

  • rehabilitation of steam-coal boiler house into gas boiler house of power 4MW
  • assembly of HKB boilers

2001

Przedsiębiorstwo Produkcyjne POLKON

64-980 Trzcianka
ul. Kopernika 32

  • disconnection form municipal central heating system
  • assembly of sas boiler house, power 2.76 MW

2001

SAPA ALUMINIUM Sp. z o.o.

64-980 Trzcianka
ul. Kopernika

  • Assembly of gas boiler house of high parameters with power of 1.96 MW, (VIESSMANN boilers, Weishaupt burners)

2000-2001

Philips Lighting Electronics Poland

Piła
ul. Przemysłowa

  • assembly of water and sewage system, icentral heating, ventilation and air conditioning installations
  • execution of compressed air and ce water systems (Trane aggregate)
  • assembly of oil boiler house 1 MW (Viessmann boilers)

2000

Spółdzielnia Mieszkaniowa Trzcianka

64-980 Trzcianka

  • assembly of gas boiler house technology, at housing estates - 6 pieces

2000

Lubmor Sp. z o.o.

64-980 Trzcianka

  • assembly of oil and gas boiler house 3.5 MW (Viessmann boilers)

2000

Liceum Ogólnokształcące w Pile

64-920 Piła
Ul. W. Pola

  • Rehabilitation of gym hall

2000

SPHINX POLSKA

64-920 Piła
ul. 14-go Lutego

  • adaptation of premises for catering purposes
  • execution of gravity ventilation system
  • performance of water and sewage system, central heating and air conditioning systems

2000

Hochland Polska Sp. z o.o.

Baranowo

  • service pipelines (steam, technological heat, compressed air, water)
  • heat recuperation installation from current generator BHKW

2000

Bydgoskie Fabryki Mebli S.A.

Bydgoszcz

  • water and sewage installation, central heating, compressed air
  • assembly of compressor room equipment
  • assembly of gravity ventilation system
  • execution of steam heat supply line Dn 150 - 16 bar
  • assembly of steam boiler - sawdust boiler - Danstoker 4t/h of steam, 10 bar
  • execution of exchanger centres for timber dryer, for heating purposes
  • steam supply pipes

2000

BP Chemicals Olimp-Flex S.A.

Złotów
ul. Za Dworcem 8

  • construction of a watch house
  • execution of fencing and site lightening

1999/2000

Mercar sp. z o.o.

66-630 Cybinka
Koziczyn

Fuel base:

  • on-ground tanks
  • fulluing-up station
  • pumping station
  • technological service lines

1999

Drukarnia Agora S.A.

Piła - Warszawa

  • water and sewage installation
  • central heating, compressed air systems
  • execution of central heating distribution centre of capacity 3MW

1999

BP Chemicals Olimp-Flex S.A.

Złotów
ul. Za Dworcem 8

  • assembly of water and sewage system, central heating, ventilation system and compressed air
  • bottle gas boiler house 800 kW using Viessman boilers
  • hot oil service line
  • Ice water installation

1998/1999

Fabryka Opakowań Tekturowych Sp. z o.o. Roman Bauernfaind

96-320 Mszczonów
ul.Tarczyńska

  • water and sewage installation, central heating system
  • external water and sewage service lines
  • steam and oil boiler-houses, boiler- Loos 5t/h 16 bar, water boiler house 500 kW
  • compressed air and ventilation systems
  • steam service line

1998/1999

Wspólnota Mieszkaniowa

Piła

  • Prime Contractor for three buildings of total cubage capacity 3 320 m3 (65 apartments)

1998

Mazowiecka Wytwórnia Wódek i Drożdży "Polmos" S.A. w Józefowie

Józefów k/Błonia

  • assembly of spirit rectification installation for Smirnoff vodka
  • assembly of rectification unit (columns, pumps, stainless piping)
  • start-up of the plant
  • assembly of water purification plant for technological purposes
  • processs engineering worked up and equipment supplied by GEA Wiegand

1998

Fabryka Wódek "Gessler"

Murowana Goślina k/Poznania

  • water and sewage installation, central heating, ventilation system
  • external water and sewage service lines
  • steam installation
  • assembly of spirit rectification installation
  • assembly of rectification columns
  • stainless pipelines
  • performance of digestive tanks of stainless steel
  • assembly of evaporators and spirit bottling plant
  • assembly of production engineering under supervision of the German company GEA-Wiegand

1 stage: 1997-1998
2 stage: 1999-2000

Fabryka Grzejników VNH Cosmo-Compact - Malarnia

Wałcz

  • water and sewage installation, central heating, heating of the hall with infrared radiators and technological installation of a paint shop
  • installation for after-burning of combustion gas from paint shop
  • gas boiler house
  • compressor room
  • ventilation system

1997

Wojewódzki Inspektor Sanitarny dla województwa wielkopolskiego w Poznaniu

Oddział Zamiejscowy w Pile

  • main overhaul of a hospital building, adaptation into a laboratory at WSSE SANEPID in Piła

1995-1996

Fabryka Czekolady "Ludwig Czekolada"

Tuczno

  • water and sewage installation, compressed air, technological steam, central heating, ventilation system and air conditioning
  • technological piping for chocolate transport
 